Ba Ria–Vung Tau to build $4.39bn thermal power plant

Tuesday, Jun 13, 2017 19:09

Phu My thermal power plant in Ba Ria - Vung Tau province. — Photo netlaw.vn

The General Electric Corporation 3 under Viet Nam Electric Group plans to invest in building Long Son thermal power plant with a total capital of US$4.39 billion in southern Ba Ria–Vung Tau Province.

The plant is designed to reduce the power shortage and improve the power supply in the southern region in the period between 2020 and 2030, and the following years.

The plant is planned to be built in Long Son Commune, Vung Tau City with an area of 132ha and a capacity of 3,600MW.

A port of Liquefied Natural Gas (LNG) with a capacity of 3.5 million tonnes per year and three turbine manufacturers with a capacity of 2x600MW will be built in the period from 2019 to 2025.

Long Son thermal power plant is expected to provide 21 billion kWh of electricity per year to the national power grid and contribute about VND4.1 trillion (US$181 million) per year to the national budget when operational. — VNS

Comments (0)

Statistic