Vietsovpetro successfully installs wellhead platform topside at Bạch Hổ oil field

Thursday, Sep 12, 2024 11:59

The wellhead platform topside block of the BK-23 drilling rig at Lot 09.1 of Bạch Hổ oil field is successfully installed on Tuesday. — VNA/VNS Photo

The Việt Nam – Russia oil and gas joint venture Vietsovpetro said on Wednesday that it completed the installation of the wellhead platform topside block of the BK-23 drilling rig at Lot 09.1 of Bạch Hổ oil field, 145 kilometres to the southeast of Vũng Tàu city a day earlier.

More than 130 workers used a crane vessel to install the 760-tonne block in accordance with schedule, ensuring safety and the most rational costs despite bad weather conditions caused by typhoon Yagi.

BK-23, an unmanned wellhead platform, is located near the existing BK-14 oil rig, which will receive oil and gas from the former through an auxiliary equipment system and connecting pipelines. — VNS

Comments (0)

Statistic